As part of the ongoing works at the Cameron site, our team is carrying out the installation of profiled sheet (profnastil) material for the exterior side walls of the driver’s cabin. During this stage, the profiled panels are carefully aligned to the required dimensions and securely fixed onto the wooden structural frame. Particular attention is…
Supervisor Room Renovation for Cameron We have successfully completed the Supervisor Room Renovation Project for Cameron. With a modern design and functional solutions, the space has been transformed into an ergonomic and inspiring workplace. 🔧 Key Highlights of the Project: Improved workplace efficiency Safer and more comfortable environment Upgraded technical infrastructure At Vertex, we go…
Vertex has been actively involved in the preparation of a drainage line and the repair of asphalt at the Cameron Base, providing custom-made infrastructure solutions to support the facility’s operational needs. The drainage line was properly installed to prevent potential issues, while the asphalt repairs were conducted to improve the durability and safety of the…