At Holcim facility, the replacement of mechanical components — chain, buckets and sprockets — of the 31B-RE1 unit was successfully carried out by our team in full compliance with safety and quality standards. Scope of work included: ✔️ Dismantling of the existing mechanism ✔️ Removal of worn chain and buckets ✔️ Replacement of sprockets and…
Strong projects start with strong preparation. At Vertex Industrial Company, we are proud to support the Baker Hughes project by providing qualified manpower support for cable way preparation, delivered with precision, safety, and efficiency. ⚡ Professional preparation of cable trays and cable routes ⚡ Site readiness for electrical and instrumentation works ⚡ Reliable, hands-on support…
Floodlight replacement works on the “Khankendi” vessel are currently in progress. Our team is carrying out the upgrade in stages, improving visibility and creating a safer working environment on deck. This is more than an equipment replacement. It is a planned technical improvement supporting safe night operations and uninterrupted marine activities. All works are being…
At the Cameron facility, the rubber seals installed on the doors were no longer providing the required insulation and functionality. Within the scope of the works carried out, these elements were replaced, restoring the technical condition of the doors. As a result, sealing performance was improved and potential operational issues were eliminated. Such interventions play…
This week, our team successfully completed the cutting and precise sorting of existing pipes according to the required lengths. Our Manpower crew worked on-site efficiently, ensuring all tasks were carried out in full compliance with safety standards. Scope of work: • Measuring and cutting pipes with high accuracy • Sorting and positioning them correctly on-site…
We have successfully completed an important technical upgrade of the air-conditioning system for the Kardex equipment located at the Baker Hughes workshop. As part of this work, the Vertex professional Fitter team carried out: ✔️ Extension of the existing metal enclosure ✔️ Full insulation of the system ✔️ Lowering the air-conditioner height to improve overall…
As the Vertex team, we successfully installed an Acrobat Arm for Baker Hughes as part of enhancing the exhaust ventilation system. This improvement is an important step toward ensuring a cleaner, safer, and more efficient working environment. The newly installed system optimizes air extraction, reduces exposure to fumes and hazardous particles, and provides a healthier…
By removing partition walls in the office container, we expanded the existing area, making it more functional and open. The workspace is now more comfortable, optimized, and allows for better movement and efficiency. This project shows that even small changes can significantly enhance operational efficiency and the overall quality of the work environment. New space,…
Every new project in the oil and gas sector tests both technical skills and teamwork. We are proud to announce that the pump installation at the West Absheron offshore area is being carried out safely and efficiently. The operation includes equipment transport, strict safety compliance, precise testing, and team coordination. Thanks to our dedicated specialists,…
As a construction company, we successfully managed not only the construction work but also the professional manpower provision for Baker Hughes. Our team demonstrated that a highly skilled workforce, proper coordination, and professionalism drive every project to success. Every detail was carefully planned, and every step executed in compliance with safety standards. This project once…
Our team didn’t just carry out insulation works on this project. We also: 🔹 Conducted technical inspections and quality checks to ensure every detail was perfect 🔹 Fully complied with safety and protection standards 🔹 Executed material selection and precise installation for long-lasting performance 🔹 Ensured effective team coordination and project planning at every stage…
Our team has successfully completed this major offshore project. Every pipe and insulation layer reflects our commitment to safety and performance. 📸 Here are some snapshots from the project – attention to detail and professionalism shine through every step! 💡 Key Highlights: Ensured long-term durability of the engine Maintained high safety standards on the platform…
Our team has successfully carried out the installation of 2 new air conditioning units at the WLS Laboratory for Baker Hughes. The purpose of this project was to: ✅ Ensure the highest level of climate control in the laboratory ✅ Reduce energy consumption ✅ Create a more comfortable and safe working environment for employees Thanks…
Supervisor Room Renovation for Cameron We have successfully completed the Supervisor Room Renovation Project for Cameron. With a modern design and functional solutions, the space has been transformed into an ergonomic and inspiring workplace. 🔧 Key Highlights of the Project: Improved workplace efficiency Safer and more comfortable environment Upgraded technical infrastructure At Vertex, we go…
We are pleased to collaborate with Halliburton on the replacement of lights at their base. Upgrading lighting systems not only enhances workplace safety but also improves energy efficiency and reduces operational costs. At Vertex, we are committed to delivering high-quality and cost-effective solutions tailored to our clients’ needs. Our expertise in engineering and EPC services…